<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-21T06:42:02Z</responseDate><request verb="GetRecord" identifier="oai:macsphere.mcmaster.ca:11375/19395" metadataPrefix="dim">https://prod-ms-be.lib.mcmaster.ca/server/oai/request</request><GetRecord><record><header><identifier>oai:macsphere.mcmaster.ca:11375/19395</identifier><datestamp>2026-09-24T06:11:30Z</datestamp><setSpec>com_11375_271</setSpec><setSpec>col_11375_272</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor">Archer, Norm</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author">Xiang, Junlian</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Business Administration</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2016-05-31T15:50:10Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2016-05-31T15:50:10Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2010-03</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/11375/19395</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://doi.org/10.71548/21182</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">&lt;p> Business process redesign (BPR) has been studied extensively since its&#xd;
initial widespread application in the late 1980s. Although a great deal has been&#xd;
learned by both practitioners and researchers about the best ways to use BPR&#xd;
for business process improvement, the overall failure rate of BPR projects is&#xd;
still reported to be high. This failure rate indicates that there is still a need for&#xd;
a comprehensive success factor model, validated with empirical evidence, to&#xd;
provide direction to practitioners that will help to improve the outcomes of&#xd;
business process redesign projects. Up to this point, few studies have&#xd;
identified and empirically tested the possible facilitators of BPR project&#xd;
success. &lt;/p> &lt;p> This is an exploratory study, where Social-Technical Theory was applied&#xd;
in the context of BPR project implementation to explain the impact of success&#xd;
factors on BPR project success. The proposed conceptual research model&#xd;
includes the following factors: BPR project champion, top management&#xd;
support, change management, process redesign, and Information and&#xd;
Communication Technology Infrastructure (ICTI) improvement. The model&#xd;
considers critical factors from both the social and technical aspects of BPR&#xd;
project practices and the relationships among them. Facets of BPR project&#xd;
outcomes, including operational quality improvement, organizational quality&#xd;
improvement, cost savings, and productivity, were also examined. &lt;/p> &lt;p> A survey of 145 managers and executives from medium and large-sized&#xd;
companies was used to validate the model. The results show that a BPR project champion is a critical success factor for BPR project success, mediated&#xd;
through top management support, and that top management support must be&#xd;
emphasized through the whole BPR project implementation procedure. More&#xd;
specifically, change management has a better likelihood of success if it is&#xd;
strongly supported by top management, while other factors play an important&#xd;
role in helping to encourage process redesign and ICTI improvements. &lt;/p> &lt;p> This study also shows that three BPR project implementation components:&#xd;
change management, process redesign, and information and communications&#xd;
technology infrastructure (ICTI) improvement, are all critical to BPR project&#xd;
success. However, change management occupies the most important position&#xd;
because it impacts significantly the success of all four facets of BPR project&#xd;
outcomes (operational quality improvement, organizational quality&#xd;
improvement, cost savings, and productivity). Among these outcomes, the&#xd;
study showed that productivity is no longer the top focus of companies;&#xd;
instead, operational quality and organizational quality have become more&#xd;
important. &lt;/p> &lt;p> This study makes a significant contribution to both theory and practice.&#xd;
The establishment of a BPR project implementation model based on&#xd;
socio-technical theory, and the development of new instruments for change&#xd;
management and process redesign, provide a foundation for future BPR&#xd;
project research. With respect to practice, the specification of three BPR&#xd;
project implementation components presents managers with clear guidance&#xd;
regarding BPR project implementation. The validated model will help&#xd;
practitioners to understand in advance what major obstacles they may face (change management, process redesign, or information technology) and how&#xd;
they should implement BPR projects in a way that will achieve their expected&#xd;
goals. &lt;/p> &lt;p>  As such, this study represents a significant advance over the existing&#xd;
literature, in the development of a valid model to explain the relationships&#xd;
between success factors and outcomes within a BPR project context. &lt;/p></dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degreetype" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Doctor of Philosophy (PhD)</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">en</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Business Process</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Redesign Project</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Social-Technical Theory</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">change management</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Business Process Redesign Project Implementation and Outcomes - A Proposed Model and Its Validation</dim:field>
   <dim:field mdschema="others" element="access-status">open.access</dim:field>